Intelligent Scheduling for Underground Mobile Mining Equipment.

Song Z, Schunnesson H, Rinne M, Sturgul J - PLoS ONE (2015)

Bottom Line: This investigation first introduces the motivation, the technical background, and then the objective of the study.A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue.The method and related algorithms which are used in this instrument are presented and discussed.

View Article: PubMed Central - PubMed

Affiliation: Department of Civil and Environmental Engineering, School of Engineering, Aalto University, Espoo, Finland.

ABSTRACT
Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.

No MeSH data available.


Comparison of timespans with different sequences.
© Copyright Policy
Related In: Results  -  Collection

License
getmorefigures.php?uid=PMC4476722&req=5

pone.0131003.g006: Comparison of timespans with different sequences.

Mentions: Suppose that there are 10 faces (Face 1 till 10) to be processed by five mining machines (in the sequence of Machine 1 to 5). Fig 6 shows the outputs which do not use this algorithm, and the results using this algorithm. Comparing with the other two sequences (from face 1 to 10 and from face 10 to 1), the optimized sequence (in the sequence of face 9-7-8-4-3-2-1-5-6-10) has the least timespan to complete the assigned operations.


Intelligent Scheduling for Underground Mobile Mining Equipment.

Song Z, Schunnesson H, Rinne M, Sturgul J - PLoS ONE (2015)

Comparison of timespans with different sequences.
© Copyright Policy
Related In: Results  -  Collection

License
Show All Figures
getmorefigures.php?uid=PMC4476722&req=5

pone.0131003.g006: Comparison of timespans with different sequences.
Mentions: Suppose that there are 10 faces (Face 1 till 10) to be processed by five mining machines (in the sequence of Machine 1 to 5). Fig 6 shows the outputs which do not use this algorithm, and the results using this algorithm. Comparing with the other two sequences (from face 1 to 10 and from face 10 to 1), the optimized sequence (in the sequence of face 9-7-8-4-3-2-1-5-6-10) has the least timespan to complete the assigned operations.

Bottom Line: This investigation first introduces the motivation, the technical background, and then the objective of the study.A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue.The method and related algorithms which are used in this instrument are presented and discussed.

View Article: PubMed Central - PubMed

Affiliation: Department of Civil and Environmental Engineering, School of Engineering, Aalto University, Espoo, Finland.

ABSTRACT
Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.

No MeSH data available.