Intelligent Scheduling for Underground Mobile Mining Equipment.

Song Z, Schunnesson H, Rinne M, Sturgul J - PLoS ONE (2015)

Bottom Line: This investigation first introduces the motivation, the technical background, and then the objective of the study.A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue.The method and related algorithms which are used in this instrument are presented and discussed.

View Article: PubMed Central - PubMed

Affiliation: Department of Civil and Environmental Engineering, School of Engineering, Aalto University, Espoo, Finland.

ABSTRACT
Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.

No MeSH data available.


Operations of mobile mining equipment in mine excavation.
© Copyright Policy
Related In: Results  -  Collection

License
getmorefigures.php?uid=PMC4476722&req=5

pone.0131003.g003: Operations of mobile mining equipment in mine excavation.

Mentions: Underground mines consist of various operations. The complexity of the operations can considerably affect how easy it is to implement the technique and how useful the output is. It is crucial to define the proper scope we are aiming for. Firstly, the use of the technique of the schedule optimization is confined to the operations in hard rock mining. Coal mining as a continuous method already has technical solutions for automated operation. Secondly, the technique is supposed to be applicable for all underground hard rock mining methods. Thirdly, exploration and closure obviously do not relate much to day-to-day mine operations. In most cases, excavation and production take place simultaneously, and most of the mobile mining equipment is used for these two stages. Therefore, the scheduling should cover the operations of excavation and production, except the mucking operation because there are software applications available for it. Without loss of generality, the common processes are considered at working face respectively for excavation and production are shown in Figs 3 and 4.


Intelligent Scheduling for Underground Mobile Mining Equipment.

Song Z, Schunnesson H, Rinne M, Sturgul J - PLoS ONE (2015)

Operations of mobile mining equipment in mine excavation.
© Copyright Policy
Related In: Results  -  Collection

License
Show All Figures
getmorefigures.php?uid=PMC4476722&req=5

pone.0131003.g003: Operations of mobile mining equipment in mine excavation.
Mentions: Underground mines consist of various operations. The complexity of the operations can considerably affect how easy it is to implement the technique and how useful the output is. It is crucial to define the proper scope we are aiming for. Firstly, the use of the technique of the schedule optimization is confined to the operations in hard rock mining. Coal mining as a continuous method already has technical solutions for automated operation. Secondly, the technique is supposed to be applicable for all underground hard rock mining methods. Thirdly, exploration and closure obviously do not relate much to day-to-day mine operations. In most cases, excavation and production take place simultaneously, and most of the mobile mining equipment is used for these two stages. Therefore, the scheduling should cover the operations of excavation and production, except the mucking operation because there are software applications available for it. Without loss of generality, the common processes are considered at working face respectively for excavation and production are shown in Figs 3 and 4.

Bottom Line: This investigation first introduces the motivation, the technical background, and then the objective of the study.A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue.The method and related algorithms which are used in this instrument are presented and discussed.

View Article: PubMed Central - PubMed

Affiliation: Department of Civil and Environmental Engineering, School of Engineering, Aalto University, Espoo, Finland.

ABSTRACT
Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.