Displacement-based back-analysis of the model parameters of the Nuozhadu high earth-rockfill dam.

Wu Y, Yuan H, Zhang B, Zhang Z, Yu Y - ScientificWorldJournal (2014)

Bottom Line: Displacement back-analyses were performed at different stages of the construction period, with and without considering the creep and wetting deformations.The comparison of calculation results based on different sets of back-analyzed model parameters indicates the necessity of taking the effects of creep and wetting into consideration in the numerical analyses of high earth-rockfill dams.With the resulting model parameters, the stress and deformation distributions at completion are predicted and analyzed.

View Article: PubMed Central - PubMed

Affiliation: State Key Laboratory of Hydroscience and Engineering, Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, China.

ABSTRACT
The parameters of the constitutive model, the creep model, and the wetting model of materials of the Nuozhadu high earth-rockfill dam were back-analyzed together based on field monitoring displacement data by employing an intelligent back-analysis method. In this method, an artificial neural network is used as a substitute for time-consuming finite element analysis, and an evolutionary algorithm is applied for both network training and parameter optimization. To avoid simultaneous back-analysis of many parameters, the model parameters of the three main dam materials are decoupled and back-analyzed separately in a particular order. Displacement back-analyses were performed at different stages of the construction period, with and without considering the creep and wetting deformations. Good agreement between the numerical results and the monitoring data was obtained for most observation points, which implies that the back-analysis method and decoupling method are effective for solving complex problems with multiple models and parameters. The comparison of calculation results based on different sets of back-analyzed model parameters indicates the necessity of taking the effects of creep and wetting into consideration in the numerical analyses of high earth-rockfill dams. With the resulting model parameters, the stress and deformation distributions at completion are predicted and analyzed.

Show MeSH
Comparison of calculation results based on the two sets of back-calculated parameters through construction completion.
© Copyright Policy - open-access
Related In: Results  -  Collection


getmorefigures.php?uid=PMC4121011&req=5

fig10: Comparison of calculation results based on the two sets of back-calculated parameters through construction completion.

Mentions: In the stepwise back-analyses of Nuozhadu dam, the creep and wetting deformations were not considered in the first analysis. Although the calculation results based on the first back-analyzed parameters agree well with the observation data before impounding, the trends of calculated displacements can be different from that of the observation data in the later period. To illustrate the influence of creep and wetting deformations, Figure 10 compares the calculation results based on Back 1 model parameters without creep and wetting deformations and the results based on Back 2 parameters with creep and wetting deformations at two typical measurement points, that is, DB-C-SR-53 and DB-C-SR-63, through the end of construction. It can be seen that the calculation results of the 2nd back-analysis are much closer to the actual measurements, especially after December 2011 (impoundment of the dam started). The reason may be that the model parameters of dam materials change with time because of the breakage and wetting of rockfill particles. That is to say, the breakage of particles and impounding will cause certain deformation. Therefore, it is necessary to take the effects of creep and wetting into consideration in the numerical analyses of earth dams.


Displacement-based back-analysis of the model parameters of the Nuozhadu high earth-rockfill dam.

Wu Y, Yuan H, Zhang B, Zhang Z, Yu Y - ScientificWorldJournal (2014)

Comparison of calculation results based on the two sets of back-calculated parameters through construction completion.
© Copyright Policy - open-access
Related In: Results  -  Collection

Show All Figures
getmorefigures.php?uid=PMC4121011&req=5

fig10: Comparison of calculation results based on the two sets of back-calculated parameters through construction completion.
Mentions: In the stepwise back-analyses of Nuozhadu dam, the creep and wetting deformations were not considered in the first analysis. Although the calculation results based on the first back-analyzed parameters agree well with the observation data before impounding, the trends of calculated displacements can be different from that of the observation data in the later period. To illustrate the influence of creep and wetting deformations, Figure 10 compares the calculation results based on Back 1 model parameters without creep and wetting deformations and the results based on Back 2 parameters with creep and wetting deformations at two typical measurement points, that is, DB-C-SR-53 and DB-C-SR-63, through the end of construction. It can be seen that the calculation results of the 2nd back-analysis are much closer to the actual measurements, especially after December 2011 (impoundment of the dam started). The reason may be that the model parameters of dam materials change with time because of the breakage and wetting of rockfill particles. That is to say, the breakage of particles and impounding will cause certain deformation. Therefore, it is necessary to take the effects of creep and wetting into consideration in the numerical analyses of earth dams.

Bottom Line: Displacement back-analyses were performed at different stages of the construction period, with and without considering the creep and wetting deformations.The comparison of calculation results based on different sets of back-analyzed model parameters indicates the necessity of taking the effects of creep and wetting into consideration in the numerical analyses of high earth-rockfill dams.With the resulting model parameters, the stress and deformation distributions at completion are predicted and analyzed.

View Article: PubMed Central - PubMed

Affiliation: State Key Laboratory of Hydroscience and Engineering, Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, China.

ABSTRACT
The parameters of the constitutive model, the creep model, and the wetting model of materials of the Nuozhadu high earth-rockfill dam were back-analyzed together based on field monitoring displacement data by employing an intelligent back-analysis method. In this method, an artificial neural network is used as a substitute for time-consuming finite element analysis, and an evolutionary algorithm is applied for both network training and parameter optimization. To avoid simultaneous back-analysis of many parameters, the model parameters of the three main dam materials are decoupled and back-analyzed separately in a particular order. Displacement back-analyses were performed at different stages of the construction period, with and without considering the creep and wetting deformations. Good agreement between the numerical results and the monitoring data was obtained for most observation points, which implies that the back-analysis method and decoupling method are effective for solving complex problems with multiple models and parameters. The comparison of calculation results based on different sets of back-analyzed model parameters indicates the necessity of taking the effects of creep and wetting into consideration in the numerical analyses of high earth-rockfill dams. With the resulting model parameters, the stress and deformation distributions at completion are predicted and analyzed.

Show MeSH